Sulphuric Acid Tank
The scope includes the work in the following areas to be done on turnkey basis:
- Supply of design and engineering drawings (as and when mentioned in the scope)
- Fabricate and supply all the components as per the supplied bill of materials
- Erect and install all the assembly as per the supplied drawings
- Commissioning and successful testing of all the installed assembly
Total material removed repaired sandblasted and painted – 48 tons.