The scope includes the work in the following areas to be done on turnkey basis:

  • Supply of design and engineering drawings (as and when mentioned in the scope)
  • Fabricate and supply all the components as per the supplied bill of materials
  • Erect and install all the assembly as per the supplied drawings
  • Commissioning and successful testing of all the installed assembly

Total material removed repaired sandblasted and painted – 48 tons.